Quick answer
As of November 2, 2026, Oklo's latest 10-K, filed March 17, 2026, warns that tariffs could raise its costs. Its risk factors use "tariff" in a trade sense 7 times. Across all nine 10-K and 10-Q filings since August 2024, the count is 17, with none before 2025. Start with Item 1A of that 10-K on EDGAR, then read the NRC's 2022 decision.
Oklo Inc. is a nuclear company that files public reports with the SEC, and those filings describe it as developing the Aurora powerhouse, a small fast-neutron reactor. Its own words on tariffs sit in those reports, mostly in the risk factors.
Our sources are nine Oklo 10-K and 10-Q reports filed from August 2024 to August 7, 2026. We also read eleven Federal Register documents, three DOE fuel pages and the NRC's 2022 decision on Oklo's license application. None of those records covers share prices. This page has no prices or forecasts; it's general information, not investment advice.
Key takeaways
- Oklo's risk factors used tariff in a trade sense 17 times since August 2024.
- The trade-policy risk factor first appeared in the 10-Q filed May 13, 2025.
- Both 2026 10-Qs say tariffs have impacted the market around fuel costs.
- The NRC denied Oklo's 2020 license application without prejudice on January 6, 2022.
- Uranium is inside the Section 232 minerals action, which chose talks in January 2026.
What Oklo says it is building
Most tariff lines in Oklo's filings come back to the cost of building and fueling one product. The 10-K for 2025, filed March 17, 2026, says the Aurora powerhouse line is designed "to produce 15-75 megawatts electric." It's also meant "to be able to run on fresh, recycled, or down-blended fuel," and the 10-Q for the quarter ended June 30, 2026 repeats both lines. A powerhouse is Oklo's word for a small power plant built around its reactor, and Oklo plans "to be the designer, builder, owner, and operator of our powerhouses." Under that plan, a pricier part is a cost Oklo pays itself, which is the cost its tariff lines warn about.
Nothing had been built yet. Both of Oklo's annual reports say so near the top of their risk summary. The line opens "We have not yet constructed any powerhouses or entered into any binding" agreement with a customer. The 10-K filed March 24, 2025 words that as a "binding contract with any customer," and the 2026 one as a "binding power purchase agreement." The 10-K names Oklo's first planned unit as Aurora-INL, at Idaho National Laboratory, and says Oklo "secured a site use permit" there from the Department of Energy (DOE).
EDGAR's filing history lists the company as AltC Acquisition Corp. until May 8, 2024.
What Oklo's SEC filings say about tariffs
In the filings that mention them, tariffs turn up in two places. One is the risk factors in Item 1A; the other, from March 2026, is a sentence on fuel costs outside that section. The two 2024 quarterly reports don't use the word at all.
Oklo's first annual report under its current name was the 10-K filed March 24, 2025. It says "Our ability to rely on global supply chains for source components and/or raw materials may be impacted by tariffs." New tariffs, it adds, "could increase our costs of materials and components, require us to find alternative suppliers, or force adjustments to our pricing structure." The same report warns that "certain components may only be available from international suppliers."
Seven weeks later, the 10-Q filed May 13, 2025 added a full new risk factor on trade policy. It follows the words "Except as provided below," meaning the 10-K's list was otherwise unchanged. The 10-Q filed November 12, 2025 repeats it: trade policy changes "may materially increase the costs we incur in developing, deploying and maintaining our reactors." If suppliers can't absorb the extra cost, Oklo's filing says, it could reach Oklo as cost pass-throughs.
Reading the May filing's raw HTML, we found three phrases in that risk factor still in square brackets. One was "[an increase in our expenditures]." The 10-Q filed August 11, 2025 prints the same text without brackets, and neither filing explains why they're there.
The 10-K filed March 17, 2026 keeps both risk factors side by side. One line ties tariffs to the calendar. "Any significant disruption to our supply chain resulting from tariffs or trade policy changes could have a material adverse effect," it says. That includes Oklo's "ability to meet projected deadlines and milestones." The two 2026 quarterly reports, filed May 12 and August 7, add no tariff risk factors, but they repeat one sentence about the past, not the future. "Tariffs, supply chain constraints, inflation, and evolving sanctions have impacted the market dynamics around fuel costs and availability."
The table's "Tariff (trade)" column is our count. It runs from zero trade uses in each 2024 report's Item 1A to seven in the March 2026 10-K.
| Form | Period ended | Filed | Item 1A words | Tariff (trade) | Supply chain | HALEU |
|---|---|---|---|---|---|---|
| 10-Q | June 30, 2024 | August 14, 2024 | 59 | 0 | 0 | 0 |
| 10-Q | September 30, 2024 | November 14, 2024 | 42 | 0 | 0 | 0 |
| 10-K | December 31, 2024 | March 24, 2025 | 22,756 | 4 | 23 | 24 |
| 10-Q | March 31, 2025 | May 13, 2025 | 392 | 2 | 3 | 0 |
| 10-Q | June 30, 2025 | August 11, 2025 | 388 | 2 | 3 | 0 |
| 10-Q | September 30, 2025 | November 12, 2025 | 1,345 | 2 | 6 | 1 |
| 10-K | December 31, 2025 | March 17, 2026 | 25,659 | 7 | 32 | 26 |
| 10-Q | March 31, 2026 | May 12, 2026 | 53 | 0 | 0 | 0 |
| 10-Q | June 30, 2026 | August 7, 2026 | 53 | 0 | 0 | 0 |
The quarterly rows are small. A 10-Q's Item 1A lists only changes, and the 2026 ones report none. Outside Item 1A, both 2026 10-Qs still use "tariff" four times each. Neither 2024 quarterly report has any. The fuel-cost sentence first shows up, among the nine filings we read, in the March 2026 10-K.
Where will Oklo's HALEU fuel come from?
The March 2026 10-K, where that fuel-cost sentence first shows up, says Oklo's powerhouses "are expected to rely at least in part on HALEU or plutonium-based fuels." The DOE's HALEU questions page defines HALEU as "uranium enriched greater than 5 and less than 20 weight percent of the uranium-235 isotope."
On supply, DOE's HALEU Availability Program page says "HALEU is not currently available from domestic suppliers."
Oklo's 10-K supply line moved from "HALEU is not currently available at scale" in March 2025 to "HALEU and plutonium-based fuels are not currently available at scale" in 2026.
The Russia line changed too. The 2025 report said sanctions mean "sourcing HALEU presents a potential supply chain risk," and the 2026 report says "sourcing HALEU presents a supply chain risk," with "potential" gone.
Diagram by DigitalTreed, quoting Oklo 10-K filings of March 24, 2025 and March 17, 2026 on SEC EDGAR, November 2, 2026.For its own fuel, Oklo's 2026 10-K and latest 10-Q both cite a DOE award: "five metric tons of HALEU produced from recovered uranium from previously irradiated EBR-II fuel." Oklo's filings place that material at Idaho National Laboratory. The June 30, 2026 10-Q adds a letter of intent with Centrus Energy for US-made HALEU for up to five Aurora powerhouses. In Oklo's words, deliveries are "expected to begin in 2029." The same filing says the letter "contemplates the negotiation and execution of a definitive supply agreement," so there's no supply contract reported yet. Under that deal, Oklo says, the terms "could include prepayments by us to Centrus."
Oklo also says it's "evaluating the use of alternative fuel materials, including plutonium," within a DOE-managed framework. DOE's HALEU Allocation Process page, read November 2, 2026, names conditional picks on April 9, 2025, August 26, 2025 and July 23, 2026. Oklo isn't among them.
DOE also plans to make more HALEU. In a Record of Decision published January 14, 2025, it chose to buy HALEU from commercial sources. The target is HALEU "enriched to at least 19.75 and less than 20 weight percent uranium-235 (U-235) over a 10-year period of performance." A July 25, 2025 notice says DOE "will blend down approximately 2.2 metric tons (MT) of highly enriched uranium (HEU)" at the Savannah River Site to make HALEU. DOE said the work would begin as early as 2025 and run about 2 to 4 years, depending on priorities and funding. DOE says it will send that HALEU, as a liquid, to an offsite commercial vendor for fabrication.
The NRC record, from 2020 to 2026
Neither the Record of Decision nor the blend-down notice names Oklo as a buyer or recipient, but the NRC record names Oklo from 2020. The NRC's January 6, 2022 press release says Oklo applied for a combined license for one Aurora reactor on March 11, 2020. A Federal Register notice of June 16, 2020 shows NRC staff docketed it as No. 52-049.
On January 6, 2022, the NRC denied Oklo's application without prejudice. Its press release cites "significant information gaps in its description of Aurora's potential accidents as well as its classification of safety systems and components." The NRC said its action "makes no safety findings regarding the Aurora design"; the Federal Register notice of January 11, 2022 says "Oklo is free to resubmit its application." After 2022, the record splits in two. Early steps are on NRC or Federal Register pages; later ones come only from Oklo's filings, because NRC web pages returned a 403 to our checker.
- March 11, 2020: Oklo files the Aurora application.
- June 5, 2020: NRC staff docket it as No. 52-049.
- January 6, 2022: the NRC denies it without prejudice. Hearing demands were due February 10, 2022.
- July 2025, per Oklo: a Phase I readiness assessment found "no significant gaps identified that would hinder acceptance of the application."
- August 2025, per Oklo: the NRC accepted its principal design criteria (PDC) topical report for review.
- April 2026, per Oklo: the NRC "approved the PDC topical report in April 2026."
None of the filings we read reports a new license application under NRC review. The 2026 10-K says Oklo is "currently working toward submitting an updated custom combined license application for NRC review." For Aurora-INL, DOE comes first. The August 2026 10-Q says "we are pursuing DOE authorization as the primary pathway." It reports DOE approval of the unit's preliminary safety analysis, announced June 11, 2026, and it also says "It is uncertain when, if at all, we will obtain NRC approvals."
At the NRC, Docket No. 52-049 links the 2020 application to the 2022 denial.
Diagram by DigitalTreed, from NRC press release 22-002, Federal Register notices of 2020 and 2022, and Oklo 10-K and 10-Q text, November 2, 2026.US trade and fuel actions that touch Oklo
Oklo's August 2026 10-Q, quoted above on approvals, names tariffs and sanctions only in general terms. Of the US actions in the Federal Register that reach uranium, the one with fixed dates is an import ban, not a tariff. The DOE's May 24, 2024 waiver notice says the Prohibiting Russian Uranium Imports Act was signed May 13, 2024. The NRC's notice says "This statutory import prohibition becomes effective on August 11, 2024." DOE can grant waivers. Any waiver "will terminate not later than January 1, 2028."
Tariffs come in through Section 232, the national security trade law, where Executive Order 14272, signed April 15, 2025, ordered a Commerce investigation of processed critical mineral imports. Its definition of critical minerals includes uranium. Commerce repeated that definition in an April 25, 2025 request for comments. A proclamation signed January 14, 2026 chose talks first. The Commerce Secretary "suggested that it may be appropriate to impose import restrictions, such as tariffs, if satisfactory agreements are not reached in a timely manner." An update on the talks is due within 180 days.
None of the Section 232 documents we've read sets a tariff rate on uranium or any other mineral.
Separate orders deal with nuclear fuel and reactors. Oklo's 2026 10-K counts four executive orders on nuclear energy signed May 23, 2025, including EO 14299 and EO 14302. EO 14302 gave DOE 120 days to plan more US uranium conversion and enrichment, covering LEU, HEU and HALEU.
EO 14299 covers reactors at federal sites. It tells the Secretary of Energy to start designating AI data centers at or run in coordination with DOE facilities as critical defense facilities. It also tells the Army to run a reactor at a domestic military base or installation "no later than September 30, 2028." A separate section gives DOE 30 days to approve or deny each complete request for a nuclear technology transfer export authorization. Neither order names Oklo. Oklo's 10-K describes the set as directing agencies to "accelerate advanced reactor deployment at DOE and DOD sites for national security and AI/data-center needs." It lists exploring work related to those orders among its plans.
Drawn by us from Oklo 10-K (March 17, 2026) and 10-Q (August 7, 2026) text, DOE HALEU pages and Federal Register notices, November 2, 2026.How to read Oklo's filings on EDGAR yourself
The Oklo quotes above come from filings on EDGAR. It's free and needs no account. The NRC and DOE quotes come from their own documents and the Federal Register. The SEC's guide to reading a 10-K says Item 1A "includes information about the most significant risks that apply to the company or to its securities."
- Open SEC EDGAR search and type Oklo. Its CIK is 0001849056. Filings before May 2024 sit under AltC Acquisition Corp.
- Filter the company's filing list to 10-K. Open the one filed March 17, 2026, and pick the main document, not the exhibits.
- Jump to Item 1A, Risk Factors, from the table of contents. Then search the page for tariff, trade policy, supply chain, HALEU and NRC, one term at a time.
- Open the two 2026 10-Qs. Their Item 1A lists only changes since the 10-K, so a short section is normal.
- Put one paragraph from two years side by side. That's how the dropped word in the Russia line shows up.
- For NRC facts, read the NRC's own documents and the Federal Register, not a company summary.
If you script the downloads, the SEC's Accessing EDGAR Data page says "Current max request rate: 10 requests/second." It wants every script to "declare your user agent in request headers." The EDGAR APIs page says the SEC's data.sec.gov APIs "do not require any authentication or API keys to access." Our script pulled Oklo's filing list that way, asking once every 1.5 to 3 seconds, far under the limit. The same API serves XBRL financial statement data; we didn't use it, because a word count needs only the filing list and the documents.
What we tested: tariff mentions in nine Oklo filings
On November 2, 2026, that script pulled the filing list and downloaded every Oklo 10-K and 10-Q filed since August 2024, nine in all. A second script cut out each Item 1A and counted terms, and we dropped two uses of "feed-in tariffs," which are about power pricing, not trade. Repeated text counts again in each filing.
Every row is in the table above. We've left out a 10-Q/A filed June 17, 2026, which only amends a certification; its Item 1A doesn't use tariff either. The 10-Q for the quarter ended September 30, 2026 wasn't on EDGAR when we ran it. The counts show how often the word appears; they don't measure what tariffs cost Oklo.
Screenshot: our local results page on 127.0.0.1, built from the EDGAR filings, November 2, 2026.What these records do and don't tell you
Oklo warns that tariffs and trade policy could raise what it pays for parts and fuel. Since March 2026 it also says tariffs, sanctions and inflation have already impacted the market around fuel costs and availability. Its named HALEU sources are one DOE award, a letter of intent and plans, while DOE says HALEU isn't available from domestic suppliers. The NRC's own record holds one application, denied in 2022. None of these records speaks to Oklo's stock, and this page doesn't either. A new 10-Q can be checked the same way. Its Item 1A and fuel paragraph go beside the August 2026 text, as we did with the two 10-Ks.
For decisions about your own money, talk to a licensed financial professional who knows your situation.
If company records are new to you, our post on the public filings behind Congress stock trading data uses the same EDGAR habits. For tip sites, see how to check a stock tip website like 5StarsStocks, and our walk-through on researching stocks before investing covers reading company records in general. Our Stonk-O-Tracker post on AMC retail investors looks at an earlier round of ticker hype. The realistic math on getting rich quick, our financial literacy tips for teens and the post on sustainable tech add background.
Oklo, tariffs and NRC questions
Frequently asked
Why did the NRC deny Oklo's license application?
The Federal Register notice cites 10 CFR 2.108, "Denial of application for failure to supply information." Oklo hadn't given enough information within the time NRC staff set in their requests.
Does the Section 232 minerals action put a tariff on uranium?
Not in the texts we read. The January 14, 2026 proclamation says the President may later weigh "minimum import prices for specific types of critical minerals."
Can a US company still import Russian uranium?
Only with a DOE waiver. The DOE notice requires a finding that "no alternative viable source of [LEU] is available," or that the import serves the national interest.
When will Oklo's next 10-Q appear on EDGAR?
We can't give a date; it hadn't appeared by November 2, 2026. Last year's third-quarter 10-Q came on November 12, 2025, and the SEC's submissions API is "updated with a typical processing delay of less than a second."
How we made this guide: On November 2, 2026, our scripts pulled nine Oklo 10-K and 10-Q filings from EDGAR with a declared user agent. They counted terms in each Item 1A. We read the NRC's 2022 press release, eleven Federal Register documents, three DOE HALEU pages and four SEC help pages. NRC web pages returned a 403, so Oklo's later NRC steps are quoted as its own account. Facts checked by the DigitalTreed team on November 2, 2026.
First published April 2025 as a news piece on tariffs and Oklo stock, without sources. Rewritten November 2, 2026 from Oklo's SEC filings and NRC, DOE and Federal Register records, with price talk removed.
Sources
- Oklo Inc. Form 10-K for 2025, filed March 17, 2026 (SEC EDGAR)
- Oklo Inc. Form 10-K for 2024, filed March 24, 2025 (SEC EDGAR)
- Oklo Inc. Form 10-Q, quarter ended March 31, 2025, filed May 13, 2025
- Oklo Inc. Form 10-Q, quarter ended June 30, 2025, filed August 11, 2025
- Oklo Inc. Form 10-Q, quarter ended September 30, 2025, filed November 12, 2025
- Oklo Inc. Form 10-Q, quarter ended March 31, 2026, filed May 12, 2026
- Oklo Inc. Form 10-Q, quarter ended June 30, 2026, filed August 7, 2026
- SEC data.sec.gov: Oklo Inc. submissions history (JSON)
- SEC: Accessing EDGAR Data
- SEC: EDGAR Application Programming Interfaces
- SEC: Webmaster frequently asked questions
- SEC: How to Read a 10-K (PDF)
- NRC press release 22-002, January 6, 2022 (PDF)
- Federal Register, June 16, 2020: Oklo Power LLC application accepted, Docket 52-049
- Federal Register, January 11, 2022: Oklo Aurora combined license application denial
- Federal Register, May 24, 2024: NRC, Effect of Statutory Prohibition on Uranium Imports From the Russian Federation
- Federal Register, May 24, 2024: DOE, Instructions for Requesting a Waiver for Russian LEU imports
- Federal Register, April 18, 2025: Executive Order 14272, Section 232 Actions on Processed Critical Minerals
- Federal Register, April 25, 2025: Commerce request for comments, Section 232 processed critical minerals
- Federal Register, January 20, 2026: Proclamation, Adjusting Imports of Processed Critical Minerals
- Federal Register, May 29, 2025: Executive Order 14299
- Federal Register, May 29, 2025: Executive Order 14302, Reinvigorating the Nuclear Industrial Base
- Federal Register, January 14, 2025: DOE Record of Decision, Final HALEU Environmental Impact Statement
- Federal Register, July 25, 2025: DOE, HEU blend down to HALEU at the Savannah River Site
- DOE Office of Nuclear Energy: HALEU Availability Program
- DOE Office of Nuclear Energy: HALEU Allocation Process
- DOE Office of Nuclear Energy: HALEU Frequently Asked Questions



Comments
No comments yet. Start the conversation below.